成全视频免费观看在线下载,夜夜春夜夜爽,色吊丝av中文字幕,亚洲一区在线

歡迎您訪問(wèn)濟(jì)南鑫路通新型建材有限公司網(wǎng)站!

路沿石的四點(diǎn)注意事項(xiàng)的使用

路沿石在我們生活中經(jīng)常見(jiàn)到,但是您了解它的使用嗎,正確的使用有利于提高路沿石的使用效果,今天濟(jì)南混凝土路沿石廠家就給大家來(lái)介紹一下我們平常使用應(yīng)該注意的細(xì)節(jié)。
Road edge stones are often seen in our daily lives, but do you understand their use? Correct use is beneficial for improving the effectiveness of road edge stones. Today, the concrete road edge stone manufacturer in Jinan will introduce the details that we should pay attention to in daily use.
路沿石在環(huán)境藝術(shù)中的應(yīng)用主要采用濕法安裝,應(yīng)注意施工工藝和施工人員的技術(shù)水平的提高,對(duì)管理人員和施工人員進(jìn)行嚴(yán)格的技術(shù)交底和施工技能培訓(xùn)。大面積工程的時(shí)候,可提前選用已趨于進(jìn)行實(shí)驗(yàn),查看其中的效果以及吻合度,然后在進(jìn)行大規(guī)模的鋪裝。
The application of roadside stones in environmental art mainly adopts wet installation, and attention should be paid to the improvement of construction technology and the technical level of construction personnel. Strict technical disclosure and construction skill training should be provided to management and construction personnel. When conducting large-scale projects, it is recommended to conduct experiments in advance to check the effectiveness and fit, and then proceed with large-scale paving.
路沿石的注意事項(xiàng):
Precautions for curbstones:
1、其啄制條石表面應(yīng)平整,無(wú)風(fēng)化,棱角整齊,其外形尺寸由設(shè)計(jì)確定,其加工應(yīng)符合設(shè)計(jì)要求,對(duì)于瀝青路面,一般在面層施工前排砌路沿石,對(duì)于水泥混凝土路面,一般先施工路面,然后排砌路沿石,路沿石基礎(chǔ)宜與路基同時(shí)填挖和碾壓。
1. The surface of the pecked stone should be flat, free from weathering, with neat edges and corners. Its external dimensions should be determined by the design, and its processing should meet the design requirements. For asphalt pavement, the road edge stone is generally laid before the surface layer construction. For cement concrete pavement, the road surface is generally constructed first, and then the road edge stone is laid. The foundation of the road edge stone should be filled, excavated, and compacted at the same time as the roadbed.
2、路沿石應(yīng)安正,切忌前傾后仰,側(cè)石頂線應(yīng)順直圓滑平順,無(wú)凹進(jìn)凸出前后高低錯(cuò)牙現(xiàn)象。沿石線要求順直、頂面平整,符合標(biāo)高要求。
2. The roadside stones should be upright and avoid tilting forward or backward. The top line of the side stones should be straight, smooth, and smooth, without any concave, convex, front or rear height misalignment. The stone line should be straight and the top surface should be flat, meeting the elevation requirements.
3、側(cè)沿石施工完畢必須用砂紙打去污垢顯出其本色。
3. After the construction of the side stone is completed, the dirt must be removed with sandpaper to show its true color.
4、路沿石鋪設(shè)與路面齊平或排水口整齊,通暢無(wú)阻,勾縫均勻,密實(shí)平整,線條直順,曲線圓滑美觀無(wú)折角現(xiàn)象,鋪設(shè)時(shí)必須滿足: 直順度允許偏差不大于10 mm,相鄰兩塊高差允許偏差不大于3 mm,相鄰兩塊縫寬允許偏差± 3 mm,頂面高程允許偏差不大于10 mm 等要求。
4. The paving of the curbstone should be flush with the road surface or the drainage outlet should be neat, unobstructed, and the joints should be even, dense and flat. The lines should be straight and smooth, and the curves should be smooth and beautiful without any bending. When laying, it must meet the following requirements: the allowable deviation for straightness should not exceed 10 mm, the allowable deviation for height difference between adjacent blocks should not exceed 3 mm, the allowable deviation for joint width between adjacent blocks should be ± 3 mm, and the allowable deviation for top elevation should not exceed 10 mm.
上面就是給大家介紹的路沿石相關(guān)知識(shí),希望能夠幫助到你們,更多關(guān)于路沿石的問(wèn)題大家可以隨時(shí)和我們聯(lián)系,我們有人員為您服務(wù)?;蛘叩卿浳覀兊木W(wǎng)站http://www.webzh.cn了解。
The above is the knowledge about roadside stones introduced to you. We hope it can help you. For more questions about roadside stones, please feel free to contact us at any time. We have professional personnel to serve you. Or log in to our official website http://www.webzh.cn Understand.

聯(lián)系
客服

13953119885
客服服務(wù)熱線

微信
溝通

掃碼微信溝通
頂部
X

截屏,微信識(shí)別二維碼